We are pleased to present the news

Installing equipment on gas power plant AZURA EDO 330kV, Benin

Installing equipment on gas power plant  AZURA EDO 330kV, Benin

Client: Siemens Nigeria Ltd.
Location: Benin, Nigeria

Project characteristics:
Installing equipment on a new gas power plant Azura, also on existing substation Benin North and installation of 3 linking 330kV towers.

Construction of transformer substation Gabiro, Rwanda

Construction of transformer substation Gabiro, Rwanda

Client: Energy Development Corporation Limited (EDCL)

Project characteristics:
Plant design, procurement, construction and commissioning of substation.

Construction of Multi-modal facility, Free trade Zone Calabar

Construction of Multi-modal facility, Free trade Zone Calabar

Client: General Electric / Julius Berger FZE
Location: Calabar (CFTZ), Nigeria

Project characteristics:
Turn Key Project – MEP, design, engineering services, testing and commissioning.
Units: Multi - modal manufacturing facility, training & administration facility, energy center, gas storage, water reservoir, waste storage, etc.

National Assembly Residence Complex (ANR) – Abuja

National Assembly Residence Complex (ANR) – Abuja

Client: Bilfinger Berger AG Nigeria Division / Federal Government of Nigeria
Location: Abuja, Nigeria

Scope of works:
MEP – Mechanical, Plumbing & Electrical works, Design and Engineering services.

Buildings:
Compound Senate President, Compound Speaker of the House (HoR), Compound Deputy Senate President, Compound Deputy Speaker of the House (HoR), General Area / Infrastructure (14,300 m2).

Transmission Line Erukan – Omotosho

Transmission Line Erukan – Omotosho

Client: Transmission Company of Nigeria (TCN)
Location: Erukan – Omotosho, Nigeria

Project characteristics:
Turn key project – Design, supply, construction & commissioning of 330kV DC Over Head Transmission Line – 160km.