Construction of transformer substation 2x10MVA, 110/30kV, Gabiro, Rwanda |
Energy Development Corporation Limited (EDCL) |
7,147,000 $ |
on going |
Plant design, supply, construction and commissioning |
Construction of transformer substation 1x10MVA, 110/30kV, Ntendezi and
extension of Bugarama tansformer substation, Rwanda |
Energy Development Corporation Limited (EDCL) |
5,949,878 $ |
on going |
Plant design, supply and installation |
Construction of Multi-modal facility, Free trade Zone Calabar, Nigeria |
General Electric / Julius Berger FZE |
29,772,485 $ |
on going |
Turn key project |
National Assembly Residence Complex (ANR) – Abuja, Nigeria |
Julius Berger Plc / Federal Government of Nigeria |
18,350,000 $ |
on going |
Turn key project - Engineering, Procurement, Construction and Commissioning of all infrastructure, EMP, Audio/Visual, Security, BMS systems on the project |
National Assembly Institute for Legislative Studies Complex (ANI – Abuja) – Abuja, Nigeria |
Julius Berger Plc / Federal Government of Nigeria |
18,300,000 $ |
on going |
Turn Key Project – Engineering, Procurement,
Construction and Commissioning of all Mechanical, plumbing, fire fighting and MCC systems on the projec |
Private Villa & compound, Nigeria |
Rodnab Construction Ltd / Private Investor |
9,750,000 $ |
on going |
Turn Key Project – Engineering, Procurement, Construction and Commissioning of all infrastructure, EMP, Audio/Visual, Security, BMS systems and power and water supply |
Construction of Transformer Substation 1 x 150 MVA & 1 x 60 MVA 330/132/33kV, Ihiala, Nigeria |
NDPHC/Federal Ministry of Power & Steel |
9,400,000 $ |
on going |
EPC project –Design, partial supply, construction & commissioning of 1 x 150MVA 330/132kV and 1 x 60MVA 132/33kV substation |
132kV Double circuit Over Head Transmission Line Elelenw -Rukpokwu Port Harcourt, Rivers State, Nigeria |
Talaveras Group of Companies |
3,900,000 $ |
on going |
Turn key EPC project –Design, supply, construction & commissioning of 18 km of DC Transmission Line |
Construction of 132kV SC Transmission Line and 132/33/3.3kV Substation at “Tarkwa” Island – Lagos for Atlas Cove Oil Depot - NNPC |
Nigerian National Petroleum Corporation (NNPC) |
11,500,000 $ |
on going |
Turn key EPC project –Design, supply, construction & commissioning of 20km of 132kV SC Transmission Line & 1x15MVA & 2x7.5MVA, 132/33/3.3kV Substation |
Construction of 330 kV, DC Transmission Line (160 km), Erukan-Omotosho |
Transmission Company of Nigeria (TCN) |
33,000,000 $ |
on going |
Turn key EPC project –Design, supply, construction & commissioning of 330kV DC Over Head Transmission Line – 160km |
Construction of Transformer Substation 1 x 150 MVA & 1 x 60MVA, 330/132/33kV (extension), Ugwuaji, Nigeria |
NDPHC/Federal Ministry of Power & Steel |
11,500,000 $ |
2015 |
Turn key EPC project –Design, supply, construction & commissioning of 1 x 150MVA 330/132kV and 1 x 60MVA 132/33kV substation |
Rehabilitation of collapsed 330kV Sapele – Aladja Transmission Line |
Transmission Company of Nigeria (TCN) |
1,440,000 $ |
2015 |
Removal of collapsed towers and material, procurement & supply of new towers and additional stringing material, construction & commissioning of rehabilitated OHTL |
Construction of 132 kV Transmission Line – Gurara-Kudenda, Nigeria |
Salini Nigeria Ltd/ Federal Ministry of Water Resources |
12,445,359 $ |
2015 |
Turn key EPC project –Design, supply, construction & commissioning of 80 km of 132kV Transmission Line |
Embassy of The Republic of Serbia in Abuja, Nigeria |
Energoprojekt/ Government of the Republic of Serbia |
4,700,000 $ |
2015 |
Turn key EPC project –Design, supply, construction & commissioning |
Construction of 132kV, DC,
Transmission Line: Underground HV Cable / OHTL Katampe -National Stadium, Abuja |
Transmission Company of Nigeria (TCN) |
13,980,000 $ |
2015 |
Turn key EPC project – Engineering, supply, construction & commissioning of 132kV DC combine Cable/OHTL connection - 12 km |
Construction of two 330kV DC Transmission Lines (2x162km), Ugwuaji - Ikot Ekpene |
Niger Delta Power Holding Company (NDPHC/NIPP) |
91,110,000 $ |
2015 |
Turn key EPC project - Design, supply, construction and commissioning of 330kV DC Transmission Lines, (2 x 162 km) Ugwuaji - Ikot Ekpene |
UYO Stadium |
Julius Berger PLC / Akwa Ibom State Government |
18,300,000 $ |
2014 |
Turn Key Project – Engineering, Procurement, Construction and Commissioning of all MEP, Audio/Visual, Security, BMS systems, power and water supply |
330kV Substation (Switchyard) Ugwuaji and 330kV OHTL Ugwuaji - New Haven (7km), Nigeria |
NDPHC / Federal Ministry of Power and Steel |
25,053,368 $ |
2014 |
Turn key EPC project – Design, supply, construction & commissioning of 330kV Substation and 330kV DC OHTL Ugwuaji - New Haven |
Twin Lakes Real Estate Development Phase 2, Lagos |
Julius Berger Plc / Chevron |
6,250,000 $ |
2013 |
Construction of various facilities for 12,000 residents (diesel-generator station, water treatment plants (potable and waste water, telecommunication systems etc.) |
330kV Substation at Gas Turbine Power Plant – GEREGU II Geregu, Lokoja, Kogi State, Nigeria |
Siemens Limited (Nigeria) |
1,100,000 $ |
2013 |
Construction, Installation & Commissioning of 330kV Substation at Gas Turbine Power Plant |
132kV Double circuit Over Head Transmission Line Afam – Trans Amadi Afam, Rivers State, Nigeria |
Talaveras Group of Companies |
5,200,000 $ |
2013 |
Turn key EPC project –Design, supply, construction & commissioning of 24 km of DC Transmission Line |
Governors Lodge Uyo - Phase III, Uyo, Akwa Ibom State |
Julius Berger PLC / Akwa Ibom State Government |
2,580,000 $ |
2013 |
Design, supply, installation, testing and commissioning for Electrical, Mechanical, Fire-fighting and Plumbing systems (equipment, materials and services) |
Construction of Transformer Substation Oke-Aro (Erukan), 2x300MVA, 330/132kV and 2x60MVA, 132/33kV, Lagos |
NDPHC/Federal Ministry of Power & Steel |
30,777,370 $ |
2013 |
Turn key EPC project – Engineering, procurement and construction of 2x300MVA 330/132kV and 2x60MVA 132/33kV SG |
Dualization of street lighting, Abuja - Gwagvalada highway |
Julius Berger PLC /Federal Capital Development Authority (FCDA) |
7,540,000 $ |
2013 |
33kV/0.415kV compact substations, underground cables and street lighting along 44km airport highway Abuja - Gwagwalada |
Street Lighting – New Lekki - Ikoyi Bridge - Lagos |
Julius Berger Plc / Lagos State Government |
980,000 $ |
2012 |
Street and decorative Bridge Lighting |
Twin Lakes Real Estate Development Phase 1A, Lagos |
Julius Berger Plc / Chevron |
11,590,000 $ |
2012 |
Construction of various facilities for 12,000 residents (diesel-generator station, water treatment plants (potable and waste water, telecommunication systems etc.) |
Governors Lodge Uyo, Phase II, Akwa Ibom State |
Julius Berger PLC / Akwa Ibom State Government |
11,820,000 $ |
2012 |
Design, supply, installation, testing and commissioning for Electrical, Mechanical, Fire-fighting and Plumbing systems (equipment, materials and services) |
Construction of 132kV DC Transmission Line (80km), Jos – Kafanchan |
PHCN |
10,160,000 $ |
2012 |
Turn key EPC project – engineering, procurement and construction of 132kV DC Transmission Line |
Reconstructions and relocations of Distribution and Transmission Lines, 33kV & 132KV in Abuja |
Salini Nigeria Ltd/ Julius Berger Plc / CCECC |
1,020,000 $ |
2012 |
Various reconstruction and diversions due to construction of roads and railways |
Reconstructions of Transmission Lines, 132kV DC in Lagos |
CCECC/LAMATA |
1,480,000 $ |
2011 |
Various reconstruction and diversions due to construction of railway in Lagos |
Transmission Line 132kV DC (26km), Afam – Port Harcourt |
Taleveras Group / Sypem/Rivers State Government |
6,970,000 $ |
2011 |
Turn key EPC project –Design, supply, construction & commissioning of 132kV DC Over Head Transmission Line Afam - Eleme (Port Harcourt) |
National Assembly Complex Phase III, Part 2, Abuja |
Julius Berger PLC / Federal Government |
6,902,000 $ |
2011 |
Design, supply, installation, testing and commissioning for Mechanical (sanitary and HVAC) and Fire-fighting systems (equipment, materials and services) |
Rehabilitation of 132kV DC Transmission Line Kaduna-Zaria |
PHCN |
2,300,000 $ |
2011 |
Rehabilitation of 80 km 132kV transmission line. First instalment of T-ACSR conductor in Nigeria. |
Relocation of Distribution Line, 33kV DC, Apo substation – Abuja International Airport |
Julius Berger PLC / FCDA |
2,000,000 $ |
2011 |
Various reconstruction and diversions due to dualization of expressway |
Governors Lodge Uyo, Phase I, Uyo, Akwa Ibom State |
Julius Berger PLC / Akwa Ibom State Government |
8,556,800 $ |
2009 |
Design, supply, installation, testing and commissioning for Electrical, Mechanical, Fire-fighting and Plumbing systems (equipment, materials and services) |
Transmission Line 330kV DC, Egbin - Ikeja West / Benin, Lagos and Extension of 330/132kV substation at Egbin |
PHCN |
9,700,000 $ |
2009 |
Turn key EPC project - Design, procurement, construction & commissioning of 28km DC TL and 2 additional bays in 330/132kV substation at Egbin |
Distribution Line, 33kV DC (44km), Apo substation – Abuja International Airport |
NDPHC/Federal Ministry of Power & Steel |
4,500,000 $ |
2008 |
Turn key project – construction of 33kV DC distribution line |
Extension of SCADA signals from the switchyard to the control rooms at Katampe 132/33 kV substation |
NEPA |
350,000 $ |
2007 |
Turn key project |
National Assembly Office Complex, Phase III, Part 1, Abuja |
Julius Berger PLC / Federal Government |
11,000,000 $ |
2007 |
Design, supply, installation, testing and commissioning for Mechanical (HVAC), Fire-fighting, Plumbing and MCC systems (equipment, materials and services) |
Switchyard at Gas Turbine Power Plant at Geregu, Ajaokuta |
Siemens, Nigeria / Federal Government |
750,000 $ |
2006 |
Turn Key project - erection of switchyard 330kV at Gas Turbine Power Plant - Geregu |
Transmission Line, 330 kV DC, Shiroro - Abuja |
NEPA/ABB |
12,450,000 $ |
2005 |
Erection of 144km, 330 kV DC overhead transmission line from Abuja to Shiroro |
Electrification of 9 villages, Gombe state |
NEPA |
450,000 $ |
2005 |
Construction of 167km of 0.4; 10; 33kV rural electrification lines & substations |
GSM Repeater Stations Kaduna - Jos Link |
Globalcom / Siemens |
500,000 $ |
2005 |
Civil works and antenna tower erection for 5 repeater stations |
Power supply at Federated Steel Mills Factory, Otta, Ogun State |
FSM |
1,240,000 $ |
2005 |
Refurbishment and upgrading of2x20MVA, 33/11kV substation, 11kV UG Cable distribution and 11kV SWGR |
Housing Development at Ologun Agbeje Rd., Victoria Island, Lagos |
Globalcom |
4,100,000 $ |
2005 |
Turn Key Project – Design, procurement, erection and commissioning of 4 floor residential building with flats for GLO |
Replacement of Distance Protection Relays |
NEPA |
3,020,000 $ |
2005 |
Replacement of distance protection in 11 Grid Power Plants and substations; Nigeria |
Construction of 132kV DC Transmission Line; Underground HV Cable/OHTL combine connection „Katampe“ –„Central Area“, Abuja |
NEPA |
19,190,000 $ |
2005 |
Design, supply, construction & commissioning of 132kV DC combine Cable/OHTL connection - 10 km |
Substation „Central Area“, 2X60MVA, 132/33kV, Abuja |
NEPA |
15,030,000 $ |
2004 |
Design, supply, construction & commissioning of GIS Indoor Substations 2X60MVA, 132kV SG with double bus-bars and 1 1/2 CBs |
Kwajaffa extension electrification project |
NEPA |
260,000 $ |
2004 |
Construction of 33kV rural electrification lines & substations |
Substation „Katampe“, 2X60MVA, 132/33KV, Abuja |
NEPA |
10,870,000 $ |
2003 |
Design, supply, construction & commissioning of 2X60MVA, 132kV SG with double bus-bars and 1 1/2 CBS - 33kV OHTL bays |
Substation „Katampe“, 2X150MVA, 330/132kV, Abuja |
NEPA |
17,360,000 $ |
2003 |
Design, supply, construction & commissioning of 2X150MVA, 330kV SG with double bus-bars and 1 1/2 CBS |
Distribution Line, 33 kV DC line, Otta - FSM, Lagos |
NEPA |
730,000 $ |
2003 |
Design, supply, construction and commissioning of 3.46km long 33 kV DC distribution line |
BAT, New Cigarette Factory Ibadan |
BAT / Energoprojekt Oprema |
20,000,000 $ |
2003 |
MEP services – procurement, installation of electrical and mechanical systems, plumbing and automation |
Distribution Line 33 kV DC line, Lekki – Victoria Island, Lagos |
NEPA |
460,000 $ |
2003 |
Design, supply, construction & commissioning of 33kV DC distribution line - 2 km |
Reinforcement of SS „Papalanto“ 132/33kV |
NEPA |
370,000 $ |
2002 |
Reinforcement of 132/33kV substation at Papalanto |
Distribution Line, 33 kV Garkida-Biu-K.Kusar-Byriel, Borno state |
NEPA |
1,800,000 $ |
2002 |
Construction of 142 km of 33 kV rural electrification lines |
Substation „Otta“, 2x45MVA, 132/33/11kV, Ogun State |
NEPA |
1,620,000 $ |
2001 |
Refurbishment of SS 2x45 MVA 132/33/11kV |
Substation „Alausa“, 2x45MVA, 132/33/11kV, Lagos State |
NEPA |
1,980,000 $ |
2001 |
Refurbishment of SS 2x45 MVA 132/33 /11kV |
Transmission Line, 330kV SC, Aliade - Makurdi |
NEPA |
6,400,000 $ |
2001 |
Construction of 46km, 330kV SC transmission line |
Mobile Station , 30 MVA, 132/33kV, Makurdi |
NEPA |
1,980,000 $ |
2001 |
Turn Key project – Design, procurement, erection and commissioning of mobile station 30MVA, 132/33kV |
Micro Wave Antenna towers at Abia, Zamfara & Gombe |
NITEL/Siemens |
500,000 $ |
2000 |
Dismantling and re-erection of 4 towers (2x120m, 85m & 50m) |
Distribution line, 33kV DC, Aja Lekki - Lagos |
NEPA |
5,700,000 $ |
2000 |
Turn Key project – procurement and construction of 20 km, 33kV DC distribution line |
Antenna towers on Kuta-Shiroko |
NITEL/Siemens |
93,000 $ |
1999 |
Erection of 3 towers |
Repeater Stations, Kano-Kaduna |
NITEL/Siemens |
311,765 $ |
1999 |
Control Building Civil Works - 6 stations |
Distribution line, 33kV DC, Amuwo-Satellite, Lagos |
NEPA |
120,000 $ |
1999 |
Construction of 33 kV D/C distribution line |
Benin-Delta 330 kV TL rehabilitation |
NEPA |
328,000 $ |
1999 |
Re-erection of 11 collapsed towers of 132kV line |
Distribution line Apir – Makurdi, 33kV, Benue State |
NEPA |
1,440,000 $ |
1999 |
Turn Key project –construction of 15km, 33kV DC distribution line |
SS „Apir“, 1x15MVA, 132/33 kV, Makurdi, Benue state, |
NEPA |
1,980,000 $ |
1999 |
Turn Key project –construction of SS 132/33 kV, 1x15MVA |
Substation „Ilesha“, 2x40MVA, 132/33kV, Osun State |
NEPA |
2,170,000 $ |
1998 |
Turn Key Project –Design, procurement, erection and commissioning of SS 2x40MVA, 132/33kV Ilesha |
Access to hangars at Kaduna Airport |
Sky Power |
360,000 $ |
1998 |
Construction of access area 7200m2 to hangars at Kaduna airport |
33kV underground cable Oworonshoki-Ogudu, Lagos |
NEPA |
1,980,000 $ |
1998 |
Laying of 33kV DC underground cable |
Substation „Uyo“, 2x40MVA, 132/33kV, Akwa Ibom State |
NEPA |
7,260,000 $ |
1997 |
Turn Key project – Design, procurement, erection and commissioning of 2x40MVA, 132/33kV SG |
National Water Rehabilitation Project, Plateau State |
Plateau State Water Board |
1,000,000 $ |
1997 |
Refurbishment and extension of water plants |
Micro Wave Antennas Jos - Makurdi, Abuja-Kaduna-Bauchi |
NITEL/Siemens |
170,000 $ |
1997 |
Erection of 6 antennas, platforms & fastenings, re-erection of towers |
Turning in and out of TL Itu-Eket at SS „Uyo“ |
NEPA |
560,000 $ |
1997 |
Construction of turning in & out of 132kV TL Itu – Eket at 132/33kV SS „Uyo“ |
Power Supply to CNL Hospital and Recreation Center, Lagos |
Chevron |
370,000 $ |
1997 |
Construction of power supply to CHL hospital and recreation center |
Staffhousing at SNCC Shiroro dam |
NEPA |
1,250,000 $ |
1997 |
Construction of 18 bungalows, 52.000m2 |
Repeater Stations Jos- Makurdi |
NITEL/Siemens |
1,762,000 $ |
1996 |
Control Building Civil Works - 9 stations |
Repetitor station Jos - Makurdi |
NITEL/Siemens |
1,762,000 $ |
1996 |
Refurbishment and erection of new towers with antennas 50-80m high on the digital microwave link - control building and 9 stations |
Power supply system, Calabar |
NITEL/Siemens |
1,762,000 $ |
1996 |
Diesel power generation plant |
Repetitor stations Kaduna – Abuja, Jos – Makurdi, Akwa Ibom state |
NITEL/Siemens |
1,762,000 $ |
1996 |
Supply, installation & maintenance of 29 solar panel / diesel generator stations |
Distribution line 33 kV, Takum, Taraba state |
Ministry of Power and Steel |
740,000 $ |
1996 |
Construction of 25km 33 kV distribution line |
Distribution line 33 kV, river crossing, Donga, Bauchi state |
Ministry of Power and Steel |
740,000 $ |
1996 |
Construction of special towers for 33 kV distribution line river crossing |
Distribution line 33 kV, river crossing, Tawafa Balewa, Bauchi state |
Ministry of Power and Steel |
740,000 $ |
1996 |
Construction of special towers for 33 kV distribution line river crossing |
Power supply to Nigerdock, Lagos |
Nigerdock |
1,800,000 $ |
1995 |
Construction of SS 33/11kV, 11kV underground cable and 11kV SG |
Distribution line 33 kV, Micika-Gulag-Madalagi, Adamawa state |
Ministry of Power and Steel |
800,000 $ |
1994 |
Construction of 65km 33 kV distribution line |
Distribution line 33 kV, river crossing, Shelleng, Adamawa state |
Ministry of Power and Steel |
100,000 $ |
1994 |
Construction of special towers for 33 kV distribution line river crossing |
Power supply to Nigerdock, Lagos |
Nigerdock |
1,700,000 $ |
1994 |
Construction of 33kV SC line from Amuwo to Snake Island and special lagoon crossing towers |
Distribution line Oshogbo – Ibadan – reerection and restringing |
NEPA |
1,112,000 $ |
1994 |
Re-erection of 29 collapsed 33kV towers and restringing of 13km 33kV line |
LDSE - Lagos Distribution System, 132kV DC TL and 33kV DC DL , Lagos State |
NEPA |
17,000,000 $ |
1992 |
Turn Key project –construction of 120km, 132kV DC transmission line and 40km of 33kV DC distribution line |
Kano State Secretariat |
Kano State Government |
82,000,000 $ |
1988 |
Construction of State Government‘s administrative complex with area of 40,000m2 |
Transmission Line Alagbon – Ikeja, Lagos state |
NEPA |
18,000,000 $ |
1984 |
Construction of 132 kV DC transmission line |
Kiri Dam, Yola Irrigation scheme |
Federal Government |
61,000,000 $ |
1984 |
Concrete Water Dam, lake and irrigation system covering 25,000 hectares |
Kano river irrigation scheme |
Federal Government |
87,500,000 $ |
1983 |
Irrigation system covering 14,000 hectares |
ASCON college |
Federal Government |
68,000,000 $ |
1983 |
Total complex area 5,000 m2 |
Eye Hospital, Kaduna |
Federal Government |
118,500,000 $ |
1980 |
Total complex area 10,000 m2 |
Housing settlement, Victoria Island, Lagos |
Federal Government |
9,760,000 $ |
1980 |
High standard condominium of 20 villas with appropriate infrastructure |
Flyover interchange, Lagos |
Federal Government |
2,300,000 $ |
1978 |
Traffic roundabout on Badagry expressway |
Countrywide electrification program |
Federal Government |
19,500,000 $ |
1977 |
Construction of 1,300km rural electrification lines |
International Trade Fair, Lagos |
Federal Government |
223,000,000 $ |
1977 |
12 exhibition pavilions, total area 80,000m2 |
Electrification of 85 towns |
Federal Government |
18,800,000 $ |
1975 |
Construction of 1,200km rural electrification lines |